Complete factory relocation from the Czech Republic to Romania

Project description:

  • Production factory relocation and relocation of all administrative fields within three months

Function:

  • Project management
  • Product:
  • Industrial trade and retail products
  • Sensor technology
  • Light controls
  • Hot-air equipment
  • Hot-glue guns

Task:

  • Training and education of personnel (direct/indirect/employed)
  • Transfer of production lines and of material
  • Expansion of production lines and infrastructure for an optimal material flow
  • Changing the logistics chain over to the new production site
  • Increasing productivity and quality to the target goal
  • Devising a social plan with the authority and the works council

Project scope:

  • 350 employees
  • 11 production lines
  • 8,000 m² of production and logistics space