Production relocation from Spain to the Czech Republic for VW Seat OEM

Project description:

  • Production relocation of fuel system assembly lines in Spain

Function:

  • Project coordinator and steering committee member

Product:

  • Fuel pump units for VW seat OEM

Task:

  • Training and education of personnel
  • Transfer of production lines and of material
  • Expansion of production lines and infrastructure for an optimal material flow
  • Changing the logistics chain over to the new production site
  • Carrying out the approval process with the customer
  • Achieving target quantities and scrap rates
  • Achieving budget key figures

Project scope:

  • 150 employees
  • 4 production lines
  • 4,000 vehicles/day
  • 2,500 m² production and logistics space